Search by artist, work title or style – e.g. Monet, Starry Night, Impressionism, Hokusai wave, nude. Describe the scene – e.g. green meadow, abstract with lots of red, dark oil painting, standing nude next to a tree.

Cover for the novel

Cover for the novel 'Jane the Blade'

(Cover for the novel “Jane the blade”)


Unknown artist

€ 124.67
Enthält 0% MwSt.
   Configure art print
Undated  ·  Engraving  ·  Picture ID: 924641

Nonclassified artists

Cover for the novel 'Jane the Blade' by Unknown artist. Available as an art print on canvas, photo paper, watercolor board, uncoated paper or Japanese paper.
Private Collection / Bridgeman Images
AR/3D   View in 3D / AR zu Favoriten hinzufügen   Add to favorites    Select wall color    View painting in a room
0 Reviews

Configure art print

Picture Frame

Medium & Stretcher

Glass & Passepartout

Miscellaneous & Extras

 Save / compare configuration
Preview Icon

Summary

Gemälde
Veredelung
Keilrahmen
Museumslizenz

€ 124.67
(inkl. 20% MwSt)
   Add to cart

Bildschärfe: PERFEKT

Should you desire adjustments to brightness and color, or a custom crop of the motif, we are happy to make these changes at no additional cost to you. Please do not hesitate to contact us.

Similar artworks selected for you

Cover for the novel Cover for the novel The cabinet of antique Cover for the novel The marriage contract Cover for the novel Cover for the novel Illustration from Cover for the novel Albert Savarus Cover for the novel Cover for the novel Illustration of Cover for the novel Cover for the novel Cover for the novel Cover for the novel Massimilla Doni Bajazet tragedy in five acts by Jean Racine - engraving in Oeuvres de Jean Racine illustrated by Pauquet and notice by Emile de La Bedolliere - 1851 Unknown Image Title page of the original edition of Balzac Roman serial: A Tavern, illustration from Berenice tragedy in five acts - engraving in Oeuvres de Jean Racine illustrated by Pauquet and notice by Emile de La Bedolliere - 1851 Phedre, by Jean Racine - engraving in Works of Jean Racine illustrated by Pauquet and notice by Emile de La Bedolliere - 1851 Frontispiece of a collection of novels and stories featuring Jacques le Fataliste by Diderot, published in Paris in 1849 Roman serial: Roman serial: Roman Serial: Detached page of Mademoiselle X. Cover in Charlatanism: Satire about consulting hypnosis magnetizers to treat diseases Novel series: The Baddington Peerage
Show more similar artworks

Similar artworks selected for you

Cover for the novel Cover for the novel The cabinet of antique Cover for the novel The marriage contract Cover for the novel Cover for the novel Illustration from Cover for the novel Albert Savarus Cover for the novel Cover for the novel Illustration of Cover for the novel Cover for the novel Cover for the novel Cover for the novel Massimilla Doni Bajazet tragedy in five acts by Jean Racine - engraving in Oeuvres de Jean Racine illustrated by Pauquet and notice by Emile de La Bedolliere - 1851 Unknown Image Title page of the original edition of Balzac Roman serial: A Tavern, illustration from Berenice tragedy in five acts - engraving in Oeuvres de Jean Racine illustrated by Pauquet and notice by Emile de La Bedolliere - 1851 Phedre, by Jean Racine - engraving in Works of Jean Racine illustrated by Pauquet and notice by Emile de La Bedolliere - 1851 Frontispiece of a collection of novels and stories featuring Jacques le Fataliste by Diderot, published in Paris in 1849 Roman serial: Roman serial: Roman Serial: Detached page of Mademoiselle X. Cover in Charlatanism: Satire about consulting hypnosis magnetizers to treat diseases Novel series: The Baddington Peerage
Show more similar artworks

Other art prints by Unknown artist

Revolutions 1848 - 1849: German National Assembly at St Paul Trepan, Surgical Tool (Drill) with Accessories Portrait of Cardinal Roberto Bellarmino (1542 - 1621). Anonymous painting. Museum of Rome The Master Singers of Nuremberg: Eva Cartoon of Franz Liszt Portrait of Gaetano Majorano dit Caffarelli (1710 -1783) Facade of the Theatre alla Scala in Milan Portrait of Michel de Nostre-Dame (Nostradamus), Astrologer (1503-1566), Detail, Maison de Nostradamus, Salon de Provence, Bouches du Rhone Charlemagne (742-814), King of the Franks Circus Maximus - The great circus or Circus Maximus, in Rome, with a chariot race 20,000 leagues under the sea. Captain Nemo on the submarine Nautilus. Illustration from the novel by Jules Verne Twenty thousand leagues under the seas The Duomo or Cathedral of Santa Maria del Fiori, Florence, Italy (Cross-Section) Ned Land, Professor Aronnax and his servant Conseil look at the Giant Octopus through the porthole of the submarine Nautilus Engraving of the book by Jules Verne Twenty thousand leagues under the seas The Siege of Paris in 845 by the Vikings with Ragnar Lodbrok at Their Head Norse Mythology: Frigga - The goddess Freyja in her chariot pulled by cats
Discover more works by Unknown artist

Other art prints by Unknown artist

Revolutions 1848 - 1849: German National Assembly at St Paul Trepan, Surgical Tool (Drill) with Accessories Portrait of Cardinal Roberto Bellarmino (1542 - 1621). Anonymous painting. Museum of Rome The Master Singers of Nuremberg: Eva Cartoon of Franz Liszt Portrait of Gaetano Majorano dit Caffarelli (1710 -1783) Facade of the Theatre alla Scala in Milan Portrait of Michel de Nostre-Dame (Nostradamus), Astrologer (1503-1566), Detail, Maison de Nostradamus, Salon de Provence, Bouches du Rhone Charlemagne (742-814), King of the Franks Circus Maximus - The great circus or Circus Maximus, in Rome, with a chariot race 20,000 leagues under the sea. Captain Nemo on the submarine Nautilus. Illustration from the novel by Jules Verne Twenty thousand leagues under the seas The Duomo or Cathedral of Santa Maria del Fiori, Florence, Italy (Cross-Section) Ned Land, Professor Aronnax and his servant Conseil look at the Giant Octopus through the porthole of the submarine Nautilus Engraving of the book by Jules Verne Twenty thousand leagues under the seas The Siege of Paris in 845 by the Vikings with Ragnar Lodbrok at Their Head Norse Mythology: Frigga - The goddess Freyja in her chariot pulled by cats
Discover more works by Unknown artist

Excerpt from our top sellers

Ice at Bennecourt Blooming Chestnut Tree Cattleya Orchid and Three Hummingbirds The Battle of Trafalgar, 1805 The Fighting Temeraire The Kiss Lady Godiva The Lonely Tree Vesuvius in Eruption Sun Glitter Over the Sea, Skagen Ejiri in Suruga Province School of Athens, from the Stanza della Segnatura, 1510-11 The Isle of the Dead, Fifth Version, 1886 The Soul of the Rose, 1908 The Grammont
Show More Artworks

Excerpt from our top sellers

Ice at Bennecourt Blooming Chestnut Tree Cattleya Orchid and Three Hummingbirds The Battle of Trafalgar, 1805 The Fighting Temeraire The Kiss Lady Godiva The Lonely Tree Vesuvius in Eruption Sun Glitter Over the Sea, Skagen Ejiri in Suruga Province School of Athens, from the Stanza della Segnatura, 1510-11 The Isle of the Dead, Fifth Version, 1886 The Soul of the Rose, 1908 The Grammont
Show More Artworks




Frequently Asked Questions about Meisterdrucke


Personalizing your art print at Meisterdrucke is a simple and intuitive process that allows you to design an artwork exactly to your specifications: Choose a frame, determine the image size, decide on a printing medium, and add suitable glazing or a stretcher frame. We also offer customization options such as mats, fillets, and spacers. Our customer service is available to help you design your perfect artwork.

At Meisterdrucke, you have the fascinating option to visualize the artwork you configured directly in your own space. For a tailored preview, simply upload a photo of your room and let the artwork appear on it. If you visit us via a mobile device, be it a phone or tablet, our augmented reality feature brings the image to life and seamlessly projects it into your space. An experience that uniquely combines art and technology.

Choosing the medium is often a matter of personal taste. To give you a clearer idea, we have provided some images for each medium. For a holistic experience, we also offer you a sample set of all paper variants so you can make a decision not just visually but also haptically. You can take advantage of the sample set free of charge – only the shipping costs will apply. You can order the sample set directly.

Do not worry. At Meisterdrucke, we do not proceed mechanically. We manually review each order. If there are any inconsistencies or peculiarities in the configuration, we will immediately contact you. Of course, our courteous and patient support is always at your side to assist you with the configuration. Together with you, we adjust your image by phone or email so that the final result exactly meets your expectations.




Meisterdrucke

   Kärntner Strasse 46
        9586 Finkenstein am Faaker See
        Austria
        +43 4257 29415
        support@meisterdrucke.com
Other languages

                   
Erfahrungen & Bewertungen zu Meisterdrucke
Post.at DHL Express Quehenberger Cargoboard
Kaiser Franz Joseph

Meisterdrucke
Kärntner Strasse 46
9586 Finkenstein am Faaker See · Austria
+43 4257 29415 · office@meisterdrucke.com
Post.at DHL Express Quehenberger Cargoboard


               


Meisterdrucke 2748 Bewertungen auf ProvenExpert.com

(c) 2025 meisterdrucke.uk